Willison Park Tennis Club Tennis Court Fence Renovation
After completing a renovation for Willison Park Tennis Club the previous year, Hyline returned in September 2026 to upgrade the remaining tired galvanised court fencing. The club chose to continue the improvement with new black PVC-coated chain mesh and a refreshed finish to the existing pipework.
The work included pulling down and removing approximately 120m of old galvanised chain mesh, installing a new gate post and replacing intermediate posts where required due to collar rot. The remaining posts were straightened and painted with industrial black automotive enamel.
The new system uses 3600mm high 45 × 3.15mm heavy gauge black PVC-coated chain mesh, 40NB top and bottom rails and three 4mm black helicoil cables. One standard pedestrian gate, 1200mm wide × 2050mm high, provides court access.
Project Snapshot
- Client
- Willison Park Tennis Club
- Location
- Camberwell VIC
- Project Date
- September 2026
- Job Type
- Tennis court fence renovation
- Removal
- Pull down and remove approximately 120m of existing galvanised chain mesh
- Post Repairs
- Install a new gate post and replace intermediate posts where required due to collar rot
- Retained Posts
- Straighten and paint the remaining posts with industrial black automotive enamel
- System
- 3600mm high 45 × 3.15mm heavy gauge black PVC-coated chain mesh with 40NB top and bottom rails, 3 × 4mm black helicoil cables and one standard pedestrian gate, 1200mm wide × 2050mm high
- Turnaround
- Completed within one week to minimise disruption to coaching and weekend play
A practical renovation for a busy tennis club
By retaining and repainting the existing pipework, with post replacements where required, Hyline provided a more cost-effective solution than replacing the entire fence. The one-week turnaround minimised disruption to the club’s coaching programme and weekend play.