Growland - Footscray VIC

Growland Footscray Security Fence Renovation

In August 2026, Hyline renovated a damaged chain mesh security fence for Growland in Footscray. Extensive overgrowth and soil erosion had buried sections of the existing boundary fence, leaving the site insecure and making the renovation a challenging job.

The scope included removing approximately 116m of damaged chain wire, along with damaged posts and barbed wires. Existing gate frames also had their chain mesh and barbed wires removed.

New posts were installed where required, followed by 2100mm high 50 × 3.15mm knuckle-barb galvanised chain mesh. The system uses cranked posts, three Waratah barbed wires, three 4mm galvanised helicoil cables and compression rails where required.

Project Snapshot

Client
Growland
Location
Footscray VIC
Project Date
August 2026
Job Type
Chain mesh security fence renovation
Removal
Pull down and remove approximately 116m of existing damaged chain wire, along with damaged posts and barbed wires, including the chain mesh and barbed wires on existing gate frames
Installation
New posts where required, new 2.1m high galvanised chain mesh fencing and three Waratah barbed wires
System
2100mm high 50 × 3.15mm knuckle-barb (KB) galvanised chain mesh with cranked posts, 3 × Waratah barbed wires, 3 × 4mm galvanised helicoil cables and compression rails where required
Site Preparation
Worked with Attrill Earthworks to clear the fence line sufficiently for new posts and mesh to be installed
✓Approximately 116m of damaged chain wire removed
✓Replacement posts installed where required
✓2100mm high 50 × 3.15mm KB galvanised chain mesh
✓Cranked posts, three Waratah barbed wires and three 4mm galvanised helicoil cables
✓Compression rails where required

Clearing the way for a secure boundary

Before the new fence could be installed, the team needed access to sections that had been engulfed by vegetation and soil. Hyline worked alongside Attrill Earthworks to clear the fence line enough for the replacement posts and new mesh to be installed.

That coordination allowed the team to tackle the difficult site conditions and restore the boundary with new galvanised chain mesh and barbed wire.